Sunday, November 24, 2019

Carlsbad Cavern Descriptive Essay Essay Example

Carlsbad Cavern Descriptive Essay Essay Example Carlsbad Cavern Descriptive Essay Essay Carlsbad Cavern Descriptive Essay Essay Carlsbad Caverns The family trip to Carlsbad Cavern was a fascinating experience. The sights the smells just the overall experience was mind blowing. I don’t think I will ever experience such an amazing summer! The overall size caverns were mind boggling. Whenever we first got there we all got into a huge elevator and descended some 15 stories into the Earth. The moment you walk into these caves it feels as if you just left earth and stepped on another planet. As we were walking with our tour guide he was describing some parts of the cavern roof was over a football field in the air. In some of the deeper parts of the caves there were these gigantic columns that would put any man made structure to shame! The air of the caverns felt almost as if you were in the forests of the Amazon; the air was thick and sticky. You could tell that the air had a ton of moisture in it. Being down there you had to really watch your step, because the ground and the rocks were covered in a thick residue of a gooey substance. It was reminded me of walking on an ice rink. Being down there introduced my nose to so many different smells that I had never experienced in my life. The smell of guano was definitely one of them smells. Guano covered everything, because of the millions of bats that hung from the ceiling. Guano had a very sharp, penetrating smell. Guano smells almost of rotten fruit. Besides the guano the caverns were covered in an odor of old was there. The smell you get from an unopened book is what it reminded me of. Above everything the sounds of the caverns is what really astonished me. Imagine millions of little wings flapping right above your head and you can never pin point the sound or tell how close any of them are. Along with the bats there was a huge river that cut through the center of the caves that are constantly cutting deeper into the Earth. Out of all the natural sounds of the caves the loudest were defiantly the hundreds if not thousands of people oohing, awing, and snapping pictures. Hundreds of families yelling at their kids and squeezing on to winding stair cases and walking miles was definitely a trip onto itself! To this day I still thank my parents for an amazing summer trip that I will never forget. One day I plan on taking my wife and kids on a trip just like that one hopefully they have an experience like I had. If ever in the Land of Enchantment the Carlsbad Caverns are a must see. You will not be disappointed!

Thursday, November 21, 2019

Hacker Target and Response Assignment Example | Topics and Well Written Essays - 1500 words

Hacker Target and Response - Assignment Example The principal objective of this paper is to identify the areas and the information that an attacker might want to obtain and the methods that they may employ in undertaking the criminal activity. The paper also seeks to highlight the possible damage that their activities may cause to the information system. It is also important to show the preventive measures and the appropriate responses towards the security threat. As said earlier in the paper, one of the probable offenders is an ex-employee of an organization. The reason for this is that the ex-employee might have negative motives of releasing sensitive information that could destroy the reputation of the organization. The primary objective of an ex-employee would be to revenge. Another area that could be attacked by the ex-employee is the financial security system. The offender could have an objective of crumbling the organizations financial stability. The terminated employee may also target the organization’s foundational information, its economic weaknesses, production information and organizational information (Covaleski, 2013). There are multiple ways in which the terminated employee may use to hack into the company’s information system. One of the ways is using other employees to obtain information; the other means they could employ is to use their knowledge of security passwords and access the organization’s information system. A well-planned data security strategy alternatively posits the objectives of the information system of a business and formulates a plan to attain these goals (Dhillon & Backhouse, 2000). Any leakage of sensitive corporate information is a pragmatic basis of corporation collapse. Precisely the data system lacking a prolific information security is prospective to be a separate collection of check procedures that include numerous severe security threats. Information systems security policies at that instance may frequently be

Wednesday, November 20, 2019

Review of the Article Development Opportunity Essay

Review of the Article Development Opportunity - Essay Example The article gives some guidelines in toning down what is necessary in learning and development (L & D) programs. An approach called RAM is suggested. R stands for relevance, which asks, â€Å"What is it for? Why are we doing it? Has the work changed? Has the business changed?†. A stands for alignment, which asks consults the stakeholders who will benefit from it. Lastly, M stands for measurement, which looks into the impact and value of the L & D (Scott, 2010). Since options to save up on L & D expenses have been cut short, online training services have been made available by a few groups where employees can log on to the company’s learning management server and choose a program they believe will help them in an area they need training for. Such service conducts an impact and learning study to monitor how they improved from the training. When people want to learn more to improve themselves, the article said they should not be controlled but instead given freedom and opp ortunity to do so. Social learning is one option. People can work across the company to network, â€Å"share knowledge and experience, collaborate and learn for their benefit and that of the company (Butler as mentioned in Scott, 2010, p. 25). Learning from colleagues could be an effective way of improving skills and experience while keeping company costs down. Leaders may also avail of outside training first and then cascade their new knowledge and skills from the training down to their employees. It is one way of imparting the culture of the organization to its people. In any case, the training expert should keep in mind the goals of the training – to improve the business and not only the people, so it yields a return on investment. L & D should focus more on practical strategies and not just theories. Review of Related Literature The global financial crisis has turned some companies to scrimp on their budgets just keep them afloat in these difficult times. Many people hav e lost their jobs as a result of the budget cuts. For employees left to work to help their companies rise above the economic crunch, training and development are ensured in the expectation that it will contribute towards the betterment of not only the individual employee but of the whole organization as well. Employee development has been identified as key to improving overall organizational effectiveness. Jones and Washington (2003) have defined it as: â€Å"Employee development refers to an integrated set of planned programs, provided over a period of time, to help assure that all individuals have the competence necessary to perform to their fullest potential in support of the organization’s goals† ( 344). Like what the article indicated, nowadays, people have more access to learning. More and more training courses are developed and offered in schools and online for people who want to go further in what they know to gain skills and knowledge in their

Monday, November 18, 2019

Chelsea Training Facility Assignment Example | Topics and Well Written Essays - 2000 words

Chelsea Training Facility - Assignment Example In addition to these, the club's first team comprising of 27 players will also be playing here. Currently they practice in Harlington on all days except when they have a match. This has to be transferred to the new site once created, to Hazelwood. Chelsea football club proposes to convert the existing golf course in Hazelwood borough into a football training academy. The academy will be the training ground for the 27 first team players in the Chelsea club. In addition to these players, the academy will embark on training youth and children from the neighbourhood schools to build them up into professional footballers. The Chelsea Football Academy will have 12 senior and grass sided grass pitches with one floodlit pitch, one all weather floodlit pitch, ancillary training areas, parking place and required landscaping. An L shaped building will also be created out of the existing one. This will provide seating for 150 spectators on the top floor and also provide for quarters for two staff in the roof space. The first team, comprising of team players aged over 21 years will be using the pitches for their continuous training. There will be a reserve team of 12 players who are in the 19 and 21 years age group. The Academy will also train a youth team comprising of youth in the ages between 17 and 19 years. ... There will also be Saturday morning training in addition to week day training in the evenings on Tuesday and Thursday. This will number to approximately 120 boys. Once Hazelwood training starts, wards undergoing training in Harlington alone will be transferred to Hazelwood for training. On Sunday mornings, there are regular U9 to U16 matches. These are currently conducted at Cobham and this would continue even after starting training at Hazelwood. There are also the Ladies teams having about 60 senior players and 50 junior players. They train generally in the Feltham Community College and in the Raynes Park High School. Matches are normally played at the Sycob Football Club in Beaconsfield. At the time of making this proposal, the Ladies teams do not have any plans of using the Hazelwood club grounds for this purpose. Factors for the Proposal The following points are observed in favour of the proposal during the analysis of the document: 1. Chelsea FC needs an academy to train and continuously build professional footballers for it. This is line with the Football Association and Football League joint statement issued, reinforcing the idea of creating academies for every professional and Football league club. 2. The Football Academies would be special development centres that will have the best of the facilities and would have to meet very high standards in terms of facilities for both players and well as staff. The centres should be capable of producing students who are not just have technical capability but would be an all round professional. The academies shall have the best coaches and the support of other professionals, viz., physiotherapists, doctors and teachers. 3. These academies shall cater to the

Friday, November 15, 2019

The Operation Of The Smart System Construction Essay

The Operation Of The Smart System Construction Essay Kuala Lumpur is the capital of Malaysia and becomes a well known international city with a large number of high rise buildings. Klang River overflowed its bank and flooded the city which between Tun Perak Bridge and Dang Wangi Bridge on 26 April 2001. Besides that, Kuala Lumpur has a very dense population and most of the residents are driving their own vehicle to works. This substantially brings a serious congestion especially during working hours. Government has decided to formulate the Stormwater Management and Road Tunnel (SMART) project to mitigate the floods and ease of traffic congestion which is carried out through a joint venture pact between MMC Corp Berhad and Gamuda Berhad with the Department of Irrigation And Drainage Malaysia and the Malaysian Highway Authority. Every mega projects in the world will undergo long process during the design phases in order to produce a best and unique product. SMART project also faced the same situation and it has its own uniqueness whereby it combines the wet and dry tunnel in a structural element. The SMART Project is an innovative solution that it serves a dual purpose of mitigates the floods and ease of traffic congestion at Kuala Lumpur. Generally, the SMART tunnel consist of a bypass tunnel constructed from underground from the upstream of Kang River towards Taman Desa which is about 9.7km in length. Besides that, there will be a holding basin in Kampung Berendam, a storage reservoir at Taman Desa, a twin box culvert structure and control gates structures. SMART tunnel is constructed by using the tunnel boring machine method. The tunnel is constructed into two decks motorway which is the upper deck and lower deck. Moreover, at the bottom of lower deck, there will be a place for the water to channel through the tunnel. The safety of the tunnel is consider as good because it is surrounded by close circuit television, 24 hours of patrol, equipped with the necessary firefighting equipment, first aid and emergency phone in the event of emergency happened. Other features of tunnel are good ventilation to maintain the air quality in the tunnel by using strong ventilators. This SMART tunnel wrote a new page of building technology in Malaysia by bring in a few tunneling technology such as tunnel boring machine. It definitely shown a new step took by the government in enhances the national transportation system and flood issue as well. 1.2 Problem Statement Kuala Lumpur is a nerve centre for Malaysia ¿Ã‚ ½Ã‚ ¿Ã‚ ½s economy and it is a capital of the Malaysia. Every year, there is an occurrence of heavy floods in this area and resulted in extensive damages. The city is also subject to traffic congestion due to the population increase in the city. In order to address the problem, government decides to build a Smart Tunnel to solve the both issue carried out through a joint venture pact between MMC Corp Berhad and Gamuda Berhad with the Department of Irrigation And Drainage Malaysia and the Malaysian Highway Authority as the executing government agencies. Smart Tunnel is serving a dual purpose which is ease of traffic congestion and mitigates the floods issue in Kuala Lumpur. However, Kuala Lumpur ¿Ã‚ ½Ã‚ ¿Ã‚ ½s SMART Tunnel is not looking so smart anymore as the there is occurrence of heavy flood at Jalan TunRazak and Kampung Baru (The Star Online, 2011).Besides that, the heavy traffic congestion in Kuala Lumpur still cannot be solve even the SMART tunnel has been constructed with its secondary function which is serve to ease the traffic problem. In order to understand better on how the SMART tunnel operates, maintain and the effectiveness of its function, it is necessary to carry out a research on how the water is diverts and how it ¿Ã‚ ½Ã‚ ¿Ã‚ ½s serve to ease the traffic at Kuala Lumpur. 1.3 Aim and Objectives Title A Study and Evaluation of SMART Projects in Malaysia Aim To establish the conceptual model of SMART projects in serving the dual purpose of flood mitigation and ease of road congestion. Objectives The objectives of the study are (i) To ascertain the operating system and maintenance system of SMART tunnel. (ii) To identify the effectiveness of the smart tunnel in mitigate flood and ease of traffic congestion. (iii) To study the benefits of SMART tunnel by comparing before and after the construction of SMART tunnel. 1.4 Scope of Study In this research proposal, three main aspects will be focused and carried out such as the operating and maintenance system of SMART Tunnel. This is mainly study on how the SMART tunnel reacts; operate when there is a heavy flood and how is the maintenance system of the SMART tunnel. Besides that, an analysis on the effectiveness of the SMART tunnel will be carried out. Benefits of the SMART tunnel will be study by comparing the before and after of the construction of SMART tunnel. On the other hand, the other three aspects that will not be focus throughout the research proposal will be the management system of the SMART tunnel, the comparison on the performance of the structure under seismic loading when there is an occurrence of earthquake and the construction method used in constructing SMART tunnel. 1.5 Research Methodology Methodology in a simplify term can be defined as a term whereby it enable the research ¿Ã‚ ½Ã‚ ¿Ã‚ ½s goal and objectives can be achieved effectively. So, it is important that a systematic methodology should carry out in order to collect all the necessary and important information to get a best result for the study. Generally, the methodology of this research proposal is as follows: First stage (Literature Review) In this stage, the study will begin with the formulation of research aim, objectives and problem statement. At this early stage, some of the secondary data will be use as reference such as articles, reference books and newspaper. Secondary data is used in this stage in order to understand the topic thoroughly thus formulates the aim, problem statement and objectives of the research proposal. Second stage (Interview/Questionnaire/Case Study) After the formulation of aim, objectives and problem statement, other necessary information will gather from primary data. The relevant information will be acquired through primary sources such as interview, questionnaire and case study. The relevant respondents that have knowledge towards the topic will be interview and questionnaire approach will also be conducted by distribute a number of questionnaires to the respondent to fill up. Third Stage After collecting all the relevant data, the data will be analyse by using a analysis method to analyse whether the objective of the research has meet. The effectiveness of the SMART tunnel in mitigates the floods and ease of traffic congestion will be analysed at this stage and another method of analysis will be done by comparing the benefits before and after the construction of SMART tunnel. Then, the result will be presented in the proposal itself. 1.6 Chapter Planned The research proposal mainly comprises of five chapters which as shown below: Chapter 1 Chapter 1 of the research proposal is just a brief on the research proposal. In this chapter, a brief introduction of SMART tunnel will be discussed. Then the aim, objectives, problem statement and scope of study will be formulated after read through the relevant information of SMART tunnel. Besides that, research methodology, the flow of chapter and planning of chapter will also be identified at this stage. At last, a work programme will be prepared by comparing the pre-planned work and actual work done throughout the research proposal. Chapter 2 The objectives that formulated in chapter 1 will be discussed more detail in this stage. In this chapter, the mode of operating and maintenance system of SMART tunnel will be study and discussed by referring to the books, journal and articles. Meanwhile, the effectiveness of the SMART tunnel in mitigates the flood and ease of traffic congestion will be elaborate thoroughly by referring to the articles. Then, the benefits of the SMART tunnel by comparing the before and after the construction of it will be identified and discussed at this stage. Chapter 3 This chapter is mainly focus on the methodology used in preparing the research proposal. Obviously, the methodology used which is primary data. Interview and questionnaire will be conducted by interview a person who had knowledge on the SMART tunnel such as Architect, Engineer and Quantity Surveying. Questionnaire will be distributed to the road users that uses SMART tunnel at least five times in a week. Chapter 4 After the collection of primary and secondary data, a detail analysis will be carried out by using the SPSS software to calculate the outcome. This will be applied to the questionnaire collected after filled up by the road users and the interview being conducted with the Architect, Quantity Surveyor or Engineers whereas the interview will be analyse by writing it into an essay form in research proposal. Chapter 5 Chapter 5 is the conclusion part prepared after the analysis of the data collected. A possible recommendation will also be produced in order to provide alternative solution to the statement as stated in Chapter 1. 1.7 Summary of the Proposal Flow Chart 1: Summary of the proposal Source: Wong Yee Vern 2.1 Introduction In the year of 2001, Government has sort out a solution that would allow a severe flood to enter into the city without flooding or cause damage to the city centre. An idea was proposed by the Government to implement a project named SMART Project by constructing a tunnel which serve a dual purpose in mitigates the flood issue and ease of traffic congestion. The procurement method of this project is design and build contract and is carry out by a joint venture between Malaysian Mining Corporation and Gamuda Sdn Bhd. Meanwhile, the concessionaire of the project is Syarikat Mengurus Air Banjir Terowong Sdn Bnd and undergoes a concession period of 40 years. The construction method of SMART tunnel is using Tunnel Boring Machine (TBM) method and it cost around RM 1.9 billion to construct. Design of the tunnel is consider as unique as it is divided into 2 decks and the length of the tunnel is about 9.7 km with an outer diameter of 13.2m. The construction of SMART Tunnel began on 25 November 2003 and officially operates on 14 May 2007. 2.2 Physical Components of Stormwater System The SMART system is a sequence of storage, attenuation and regulated flow. The system diverts flood discharges from the city centre and subsequently releases them downstream while ensuring the flood problem is not transferred elsewhere (Ir. Ng Koh Hing, Ir. David N. Welch Subathra Devi Ramachandram, 2008). No overflow shall occur by ensuring the system optimizes the storage, attenuation and regulation within and adjacent to the system. Generally the bypass system consists of intake and outlet system. Besides that, the intake and outlet system consist of a debris removal system complete with floating booms, trash rack and a debris removal and disposal unit. A river flow diversion system complete with a 4-bay diversion weir structure and an 8-bay offtake structure shall also be part of the intake and outlet system. Then a set of twin box culverts which gated at both end conveys the discharge from storage reservoir to Kerayong. Moreover, a holding pond will be situated at the upstream of the tunnel with a storage capacity of 600,000 cubic metres and a storage cum attenuation pond with a storage capacity of 1,400,000 cubic metres located at the downstream end of the tunnel. 2.3 Operation of the SMART System When there is an event of downpour of rain, the data collected will be analysed to predict the operation mode of SMART Tunnel. For instance, when mode II is predicted by the analysis of data collected then action will be taken accordingly. Initially, this means that the defined operating rules will be operated and the sequence of operation will be displayed for monitoring and supervision purpose in Stormwater Control Centre (SCC) which involved the operation of various gates. The mode of operation of SMART tunnel will be subdivided into 4 modes. 2.3.1 Operation Rules of SMART Tunnel Before 2.3.2 Modes of Operation The operation of SMART tunnel and motorway is depend on the flood condition at the upstream of Klang River or Ampang River and works on four principle mode. The principle mode of operation system of SMART tunnel can be referred to figure 1.2. Mode I This is the mode when the raining water is very little and traffic is allowed in the tunnel thus no diversion of water into the tunnel is required. Mode II This mode is activated when the flow rate is between 70-150m3/s which means that when the flow rate of the rainwater recorded at the upstream is between these rate, Mode II will be automatically activated. The road tunnel traffic will remain opened to the road users but the excess flood water will be diverted to the holding pond and the lower deck of the tunnel will channel the flood flow to the attenuation pond with a flow rate of 50m3/s. Mode III When there is a heavy rain fall, this mode will be activated and the flow rate is 150m3/s or more. However, the traffic is motorway is required to be close down in order to allow the water channel through the both tunnel. Under such circumstances, the tunnel will be close up to 8 hours after the rain stops to do some maintenance work. Mode IV After the 2 hours of declaration of Mode III, this mode will be activated if the rain water storm prolong and the road tunnel will be re-opened to the traffic only within 4 days of closure. Moreover, the tunnel will be used for channel the floods after the completion of evacuation of traffic. Figure 1.2 Operation Mode of SMART tunnel

Wednesday, November 13, 2019

Different possible themes in The Yellow Wallpaper. -- English Literatu

Different possible themes in The Yellow Wallpaper. There are a couple different themes in the short story "The Yellow Wallpaper" by Charlotte Perkins Gilman. Feminism is the main theme in the story. Something else that could be a theme is being confined to a certain area, excluded from the public, can drive one insane. Another possible theme is control. Jane is controlled in her every move. These themes are shown to be true throughout the story. Feminism plays a huge role in this story. Back in the day women used to be looked upon as having no affect on society other than bearing children and keeping house. It was hard for women to express themselves in a world ran by males. The men had the jobs, the men had the knowledge, the men had everything that women didn't. It is different in today's time, but some of the old timers still believe the way they did back then. Wallpaper is a feminine product, and it symbolizes female imprisonment in this story. At first Jane uses the wallpaper to work on expanding her literary imagination. After John shoots down her creativi...